Here you see a 10” block to 8 in split face transition we laid, once the grading is done the 10”disappear and only the split face is visible.New concrete stepsNew siding always looks the bestSupporting the house while we install a new foundation underneathNew Front PorchNew cabinets, counter tops, and floor all in about seven days.It was a little muddy but the deck boards are down and the rough cut is up so now we can work on the porch roof.Our addition project almost complete. This was just after we installed the new Anderson windows all the way around.We used a very nice and heavy support beam for the additionExterior walls going up fast.Foundation just about done.This build consisted of drywall and lots of it.Here we bricked the front and installed metal siding on the top and around the sides of the building.We gave this house a whole new look all the way around. We installed new gutters, down spouts, as well as soffit and fascia.Composite deck. New hand rails. Pillars to support the existing roof.After installing tile floor and a new toilet we installed the stone as an accent wall. We finished with a dark trim and crown molding.On this build we installed new flooring, cabinets, counter tops, a new sink as well as a tile back splash set on a diagonal.For this project we built a tile shower. This shower featured a large showering area with a rainfall shower head. We also installed a custom built shower door to really finish the job.On this build we dug, poured a footer, laid block, and poured concrete and also installed a beam across the center for support.
First we relieved some pressure off of the block wall by digging around the foundation.Later we held up the barn on beams and cribs.We removed the old block and installed a new block foundation all the way around.We laid the block, installed glass block windows and added some man doors.Here’s a picture of three of the nine glass block windows we installed at the barn.On this build we built two new porch roofs, and installed new siding.Here we shingled two low roofs and fixed the water damage on the inside.We dug up the existing drains and installed a new sub pump.New drains and a new sub pump.